🏗️ Built for UK construction teams

Create Site-Ready Risk Assessment & Method Statement in Half an Hour — Not Half a Day.

FCS RAMS Creator guides you through a structured 7-step process to produce a complete, site-ready Subcontractor Risk Assessment & Method Statement — properly formatted and ready to hand to your Principal Contractor.

✓ Secure document storage   ✓ Built for UK sites   ✓ PC-ready output

Subcontractor RAMS — 7 structured steps
🎉 First Document Free
Limited Time No Card Required
Modern Construction Site

Example Output

This is what you get.

Click any page to view full size.

What\'s included

Everything you need for compliant Subcontractor RAMS

📋

Risk Assessment

Structured hazard identification with pre/post risk scoring using a 5×5 matrix. Tailored to your actual activities.

📄

Method Statement

Step-by-step sequence of works generated around your specific trade and scope. Professional, detailed and site-ready.

PC Approval Ready

Includes document control, competence statement, briefing record and Principal Contractor sign-off section.

Built for the people doing the work

Subcontractors

Quickly generate RAMS that match your trade, site and tasks so you can get on with the job.

Site Managers

Keep the whole team aligned with consistent project data, version control and handover-ready PDFs.

Safety Advisors

Ensure compliance with clear controls, competency statements and a defensible risk management record.

Your next site document. Done properly.

Start creating professional RAMS documents today.

Get Started →

Why It Works

Built around the way construction RAMS are actually written

Not a blank template. A structured workflow that covers every section your RAMS needs — in the right order, with the right prompts.

Construction Hazard Library

A built-in library of common UK construction hazards, control measures, and PPE requirements — organised by trade and task. No starting from a blank page.

Guided Step-by-Step Builder

The workflow takes you through project details, site intelligence, task breakdown, hazard identification, and method statement — one section at a time. Nothing gets missed.

Site-Ready PDF Output

Every completed RAMS exports as a clean, professional PDF — properly formatted, ready to print, sign, and hand to your team or principal contractor.

The Problem

"Writing RAMS from scratch takes hours you don't have on a busy site."

Half a Day Gone

A properly written RAMS for a straightforward job can take 3–4 hours. On complex projects it takes longer. That's time spent away from the site, not on it.

Copy-Paste Errors Create Real Risk

Reusing an old RAMS without updating the hazards, controls, or site-specific details is one of the most common compliance failures found during HSE inspections.

Word Documents Weren't Built for This

Struggling with broken formatting, tables that shift, and logos that won't sit right — every time you open a document on a different machine.

Ready to produce your first RAMS?

Create a free account and build your first Risk Assessment and Method Statement today. No templates to wrestle with. No formatting headaches. Just a structured workflow and a professional document at the end of it.

Create Your First RAMS